Early Learning Centre
Sixteenth Street Mildura
Client: VAG Project Management
Started: September 2023
Completed: February 2024
At the time this was the biggest job we have ever completed. The project cost estimated $3 million is to be the second new childcare facility in sixteenth street Mildura.
This monstrous project consists of 7 megasized rooms with a massive raked ceiling in each room. It has 7 lots of toilets, a disabled toilet, huge industrial kitchen, several offices, a laundry and sleep room, that all connects to a massive 35m passage.


On this job we had Installed:
-
over 3300 m2 of plasterboards
-
1700 m2 of insulation
-
800 lm of sqaure set bead
-
630 lm of bull nosed external bead
-
30,000 screws
-
3200 lm of ceiling battens
Plus heaps of compounds, and other materials to get his mega centre completed.